![](https://cdn.prod.website-files.com/6419d9d6af14f567608464b9/641b3b353a1205f2fc7f7c73_FINAL%20Full%20LogoWHITE.png)
2424 Congress St. San Diego, CA 92110
Phone: (619) 296-6247
Email: info@soltekpacific.com
Estimating Fax: (619) 296-4314
Contractor’s License #886641
All rights reserved. Powered by Webflow
. . . . . . . .
This project involved procuring all services, labor, materials, and equipment required to deliver a single-story Naval Operational Support Center (NOSC) for the Navy Reserves at Naval Air Station Lemoore (NAS Lemoore), replacing the existing aged facility using the Design-Build method. The project included implementing a special foundation system, reinforced concrete masonry unit walls, structural steel roof framing, and a standing seam metal roof. The project also included providing an administrative space, medical unit areas, and a drill hall at NAS Lemoore in Lemoore, California.
Project Location: Lemoore, CA
Delivery Method: Design-build
Owner: Department of the Navy
Value: 16,606,336
Square Footage: 26,431 sq.ft.
Market: Department of Defense